PDA

View Full Version : 2017 Sloped roof Column in Graphical Column Schedule



Spark Yunker
2016-06-23, 09:28 PM
I would like to know if there is a way to combine columns in a column schedule based on similar height. When we have a sloped structure, we have columns that will rise to the same level and vary within 6" or more of each other. The graphical schedule at the moment makes a new entry for every different total height. So, if a column is 1/8" taller than the next, it gets an all new entry.

Just curious if anyone has been able to force the schedule to consolidate further than it can. This is really the last hurdle in our office before we really get to work making the schedule do what we want.