PDA

View Full Version : 2016 SCHEDULE NESTED SHARED PANEL FAMILY TYPE IN HOSTED DOOR ROW



aheitzman79
2018-08-28, 07:52 PM
I have a door family with shared nested panels, both the hosted door family and the nested families are door families. I am trying to schedule the nested shared panel by Type in the Door schedule and I am having a difficult time reducing it to 1 row, where as the Panel Type will be used in the same row as the hosted door. In other words a collapsible schedule. I am currently in Version 2016, maybe it is a Version issue? Or is this something that cannot be achieved (yet) with Revit Schedules?

Attached are clips of the current door schedule in construction and the targeted end result.

Thank you!