PDA

View Full Version : Wall hosted items scheduleing on the wrong side



Andre Baros
2005-04-06, 03:33 PM
We have a problem with wall hosted plumbing fixtures which cut into the wall in some way scheduling on the wrong side of the wall (ie toilet listed as hallway instead of bathroom etc.) Any suggestion what controls this so I know what to fix.

Thanks