jamesd10181097
2005-04-25, 08:06 PM
Is it possible to assign multiple issue dates in teh sheet set-up. I am working on a project that is phased and we are issuing 2 seperate bid packages.
I would like to have a line showing the issue date of each bid package. So the sheets for bid package #1 would only have the date that it was issued but Bid Package #2 would have issue dates for both bid packages.
Do I need to manually place the second date?
I would like to have a line showing the issue date of each bid package. So the sheets for bid package #1 would only have the date that it was issued but Bid Package #2 would have issue dates for both bid packages.
Do I need to manually place the second date?