Is it possible to assign multiple issue dates in teh sheet set-up. I am working on a project that is phased and we are issuing 2 seperate bid packages.

I would like to have a line showing the issue date of each bid package. So the sheets for bid package #1 would only have the date that it was issued but Bid Package #2 would have issue dates for both bid packages.

Do I need to manually place the second date?

beegee
2005-04-25, 09:46 PM
Have you considered shared parameters ?

luigi
2005-04-26, 08:59 AM
In my previous job we had a minimum of 10 "issued dates" and "issued for", we did this for each sheet (instance parameter), in your case, i assume, you would make them a (type parameter) that would have only one category selection (project information) that way it is accessed from any sheet, but it will change for the whole project. In this case, you need to really think how this is going to effect the way you are doing things. Do you have the main issue date as the first one, then you would have an issue date2 and an issue date3, etc.