PDA

View Full Version : Schedules: Remove gap, calculations



Chad Smith
2004-01-29, 12:57 AM
2 schedule Q's.

1. Is it possible to remove that gap between the Column Headers and the scheduled data? If not, then could this be added as an option for the next release Revit Team.

2. I would like to be able to calculate percentages of topography areas to site area. I currently have this working with a custom parameter in the schedule for the Site Area which I manually have to fill out. Is it possible to use the actual site area from a Property area parameter? I hope that makes sense.

beegee
2004-01-29, 05:43 AM
1. You can turn off the title and/or column headers, but I don't think you can remove the blank line between the headers and the data. ( Unles you export, format in word etc and import as pdf or jpg )

2. You can schedule the topographic area and manually enter the site area ( since its probably not going to change often ) and have the schedule calculate the percentage of topo to site. The % will update when the topo changes. You can schedule the site area independently, but thats not much help unless you export to ODBC.

http://www.zoogdesign.com/forums/phpBB2/download.php?id=1297

Chad Smith
2004-01-29, 06:28 AM
Thanks Beegee.