Why?!? Why do I get the projects started in Revit 4.x?
I have a project with three floor levels. Level 1 West wall is cast in place conc 16" thick. Level 1 South wall is Brick on Metal stud (12" thick").
Level 2 and level 3 south and west wall is the same Brick on Metal Stud.
The CIP 16" wall is to align with the south walls face of brick. If I keep the south wall 1/128" from the west wall everything on that level is fine. Then if I try to put another south wall on top of that it screws up my walls below and my second level walls do not join properly.
Yes I have tried to edit the elevation profile but tha still does not work.
I can get this to work in a NEW 6.0 project.
I am going insane.
I have a project with three floor levels. Level 1 West wall is cast in place conc 16" thick. Level 1 South wall is Brick on Metal stud (12" thick").
Level 2 and level 3 south and west wall is the same Brick on Metal Stud.
The CIP 16" wall is to align with the south walls face of brick. If I keep the south wall 1/128" from the west wall everything on that level is fine. Then if I try to put another south wall on top of that it screws up my walls below and my second level walls do not join properly.
Yes I have tried to edit the elevation profile but tha still does not work.
I can get this to work in a NEW 6.0 project.
I am going insane.