Hi all,
What happens when I have 2 or more different revisions on different sheets? Say on plan I've added a window on the North elevation and added a door on the South elevation. The 2 elevations are on 2 different sheets. I go to the plan and cloud the window & door, type 'Window & door added' to the schedule. When I go to the north elevation sheet and cloud the window, the same description is automatically added to the schedule, although what I want it to read is 'Window added'. Similarly on the south elevation sheet I want it to read 'Door added'. Is this not possible?
Thanks.
kwong