Taylor A
2005-09-28, 02:33 AM
I have a site where I have created pads. I moved the original topo surface to the existing phase. I use the Graded Region tool which copies that surface and puts it in the New Construction phase.
When I create a topo schedule my cut a fill calcs say ZERO. I done all this in Revit 7. I don't remember having create an existing phase.
Sketches attached
When I create a topo schedule my cut a fill calcs say ZERO. I done all this in Revit 7. I don't remember having create an existing phase.
Sketches attached