Has anyone tried this successfully?

TIP: To include project parameters and area schemes from the linked rvt file into the host rvt file, copy a schedule in the linked rvt file that is on a sheet and that has the desired project parameters or area schemes. Next, paste that schedule onto to a sheet in the project. This brings the project parameters and area schemes into the host project and allows you to schedule them. If you have already loaded the link into the host project, unload the link first, and then copy/paste the schedule into the host project to see the parameters and area schemes.


It appears that you can schedule model elements from the linked file in the host file but you cannot tag them-or tag rooms.
The areas mentioned above: are they those defined by area boundaries and not walls and room separators?