Phil Palmer
2004-03-05, 12:49 PM
Has anyone noticed that if you place a schedule onto a sheet and break the schedule into various sections to fit onto the sheet.
When you then place another schedule onto another sheet you are stuck with exactly the same breaks and formats etc.
The obvious way is to duplicate the entire schedule but this can be a problem if you have loads of the same schedule.
I expected to be able to break and move the schedule per sheet view.
When you then place another schedule onto another sheet you are stuck with exactly the same breaks and formats etc.
The obvious way is to duplicate the entire schedule but this can be a problem if you have loads of the same schedule.
I expected to be able to break and move the schedule per sheet view.