Clyne Curtis
2005-11-03, 05:18 PM
Hey All,
We are laying out a 12 story building on our campus and I am trying to figure out the best way to handle room scheduling by floor. As I have searched previous posts it seems that I have two options It has been suggested that each floor be created using a different phase and the rooms could then be tagged within each phase and separate schedules generated.
or
Place all the rooms in a single schedule and handle the individual floor scheduling through the use of the filtering options.
I'm hoping to find out more of the pluses and minuses of these methods or any other method you might be using. This project is the first of many buildings we will be migrating to Revit over the next year and I would definitely like to start on the right foot!
Thanks!
Clyne
BYU
We are laying out a 12 story building on our campus and I am trying to figure out the best way to handle room scheduling by floor. As I have searched previous posts it seems that I have two options It has been suggested that each floor be created using a different phase and the rooms could then be tagged within each phase and separate schedules generated.
or
Place all the rooms in a single schedule and handle the individual floor scheduling through the use of the filtering options.
I'm hoping to find out more of the pluses and minuses of these methods or any other method you might be using. This project is the first of many buildings we will be migrating to Revit over the next year and I would definitely like to start on the right foot!
Thanks!
Clyne
BYU