I have a building with multiple levels that I would like to schedule. Some levels are only a +/- 1' difference in height. I would like to have 2 levels in a schedule. Door, window & room finish schedules are what I am talking about. When I filter out the levels it only allows me to filter one level. When I try to add another filter (different level) it doesnt show any doors, windows or room finishes.

In addition I have multiple worksets and I am assuming that since there have been a couple of level changes and the tags are still associated with the previous level that short of deleting the levels and recreating the levels that the tags cant be altered to change their level status.

Any help would be greatly appreciated.

John Fleming
GMK Architecture, inc.

beegee
2006-02-26, 03:04 AM
To filter by level and have 2 levels present in the schedule, you could one of the filters such as " equals ", "is above", " is at or below " etc.
You can filter to a depth of 3.