View Full Version : Transfer Project Standards In a Workset
kparks140020
2006-03-03, 05:05 PM
We have a project that has a Central file and worksets; but, project standards need to be transfered from another project into our current workset/Central file. Should standards be transfer into a workset and then "Save to Central" or should the transfer be made in the Central file only? With my time in Revit, I think this will not be an issue either way.
patricks
2006-03-03, 05:25 PM
I would just open both central files, transfer as needed, save the current project's central file, close both, then open your local and update everything.
aaronrumple
2006-03-03, 06:13 PM
Shouldn't matter which way it is done.
kparks140020
2006-03-03, 07:18 PM
Thanks for the response guys. For the new Revit users here, I may have them transfer standards through the workset and not touch the Central file.
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.