View Full Version : Underground work and pads...
DanielleAnderson
2006-05-10, 09:10 PM
I have a building that is a bit ice-berg like in that the underground parking garage is, in some places, buried without building on top. Obviously when i create a pad it cuts more ground than I need it to. I really wish there was a way to sort of "backfill" in revit...
I would love to hear suggestions on how to deal with this...Thanks! 8)
christopher.zoog51272
2006-05-11, 02:19 AM
I have a building that is a bit ice-berg like in that the underground parking garage is, in some places, buried without building on top. Obviously when i create a pad it cuts more ground than I need it to. I really wish there was a way to sort of "backfill" in revit...
I would love to hear suggestions on how to deal with this...Thanks! 8)I use floors made up of the structural slab and the ground material to "backfill" the area. If it' steeply sloping you could try another toposurface in the same file, or in another "linked in" revit file. I
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.