Can you set a phase for an opening in a host or for a shaft?
narlee
2006-05-16, 05:21 PM
Doesn't seem so.
What I do is create a separate infill, that can be geometry-joined with the "host", if you will. Then I give that infill it's own phase definition.
Geof.
Dimitri Harvalias
2006-05-16, 05:43 PM
If you create an opening in a wall as a door family type then you can phase it. As for holes in floors or 'openings', don't think so.
mmodernc
2006-05-16, 09:46 PM
Thanks guys
I have found with the shaft tool that if you try to put an existing part of the floor in a previous phase it cuts it even though the shaft was made in a later phase. So you put this infill bit in say the existing phase -representing the part that gets demolished in a later phase- but the shaft tool cuts it out when the phase is set to "existing" as well as when set to "new construction".
narlee
2006-05-16, 11:13 PM
So, you're getting the shaft?...tool.:).
This sounds like one of those "Revit shortcut-automatic thingys" I try to stay away from and do it the old-fashioned way, i.e. forget the shaft-tool thing and shape each floor with a hole in it (& infill as described above). The problem I sometimes find with these "Revit shortcut-automatic thingys" is they're good but not good for all situations.
Danny Polkinhorn
2006-05-16, 11:33 PM
Just a thought, can you use the linework tool and set the shaft edges to invisible in the earlier phase? Not sure if you're showing floor material or not (assuming you're not).