ford347
2006-06-13, 02:02 PM
I noticed you are able to place a schedule on multiple sheets now! That's new right?? Anyway, I like that you can do this, but when you make an adjustment to the schedule on one sheet, i.e. size, split or whatever, it does the same thing in the other sheet, which doesn't always work if the sheet doesn't have the same layout. In this particular instance, it is a 2 story structure and I have made a roof finish schedule for both the first and second story. I then made a material key for the abbv. in the finish schedule. Since each finish schedule uses the same material key and they are not on the same sheet, I would like the material key on both sheets. Anybody know a way around this?