lhanyok
2006-06-16, 07:51 PM
I am trying to set up worksets in a 12 unit condo project. I understand the basics of worksets - I've learned how to create a new workset, control visibility, open selectively, and move objects into different worksets with no problem.
I have now come across a stumbling block. There are three unit types in the project, with each unit type set up as a group. I wanted to place the units on a separate workset. Four of the 12 units are on the default workset, and I had no problems moving them over. However, the remaining units are on a workset "View "Floor Plan: Level 4."" I did not do the initial work on the project, so I'm not entirely sure how the groups were placed, but is it best to leave them on a view workset, or is it possible to move them?
Thank you for your help.
I have now come across a stumbling block. There are three unit types in the project, with each unit type set up as a group. I wanted to place the units on a separate workset. Four of the 12 units are on the default workset, and I had no problems moving them over. However, the remaining units are on a workset "View "Floor Plan: Level 4."" I did not do the initial work on the project, so I'm not entirely sure how the groups were placed, but is it best to leave them on a view workset, or is it possible to move them?
Thank you for your help.