Okay,
so what I was able to come up with was to make a door and then a window schedule and add a parameter called MO/RO Area with a formula =Width*Height and I get what I want but the information is on two separate schedules one for door and one for windows....
Basically what I want to do is be able to query a wall for the total area of its openings so that I can make sure I am meeting the proper open space requirements.
I have also tried a Mateial take off and a wall schedule and I can not seem to make it work...
can someone please help me.
so what I was able to come up with was to make a door and then a window schedule and add a parameter called MO/RO Area with a formula =Width*Height and I get what I want but the information is on two separate schedules one for door and one for windows....
Basically what I want to do is be able to query a wall for the total area of its openings so that I can make sure I am meeting the proper open space requirements.
I have also tried a Mateial take off and a wall schedule and I can not seem to make it work...
can someone please help me.