orwake
2006-07-24, 07:50 PM
I am finding some aspects of the new Material Take-off Schedules very useful but....
is there away to assign costs to each material that can then be included in a calculated value? If I assign a cost to the Identity Data of a specific material, it is not available in the fields for calculated values. Is there another way to assign this or can I only export the Schedule to Excel, etc, and get my totals there? Seems like an "almost" useful feature if not. I posted a few days ago re: a door schedule not being able to report the wall thickness it is placed in and am still mystified at why these relationships are not more usable.
is there away to assign costs to each material that can then be included in a calculated value? If I assign a cost to the Identity Data of a specific material, it is not available in the fields for calculated values. Is there another way to assign this or can I only export the Schedule to Excel, etc, and get my totals there? Seems like an "almost" useful feature if not. I posted a few days ago re: a door schedule not being able to report the wall thickness it is placed in and am still mystified at why these relationships are not more usable.