Hi, after placing my Revision Schedule onto my title sheet template and loaded it into my project, I did a revision cloud but the date only shows as "Date 1" and the revision description as "Description 1". How do I get it to display the proper date and discription?
Thanks in advance.
Dimitri Harvalias
2006-09-12, 04:39 AM
From the menu Settings/Revisions
Firmso
2006-09-12, 04:52 AM
From the menu Settings/Revisions
Thanks.
Now the problem is getting the revision number to tag the revision cloud.
Any workaround?
Great help.
Scott D Davis
2006-09-12, 04:54 AM
Thanks.
Now the problem is getting the revision number to tag the revision cloud.
Any workaround?
Great help.
Huh? not sure the problem. Just go to Drafting>Tags>By Catagory and tag the cloud.
Firmso
2006-09-12, 05:01 AM
Huh? not sure the problem. Just go to Drafting>Tags>By Catagory and tag the cloud.
What I wanted is to tag the cloud using the revision number in the revision schedule so that when I modify th e number in the schedule, the cloud tag would update without me manually figuring out what clouds are affected.
Thanks
Edit: What Annotation .rvt should I use to create the cloud tag if I should have to?
Scott D Davis
2006-09-12, 05:09 AM
revision tag.rfa
Firmso
2006-09-12, 05:13 AM
revision tag.rfa
Can't seem to locate revision.rfa
Scott D Davis
2006-09-12, 05:16 AM
C:\Documents and Settings\All Users\Autodesk\Revit Building 9\Imperial Library\Annotations\Revision Tag.rfa
Then Saveas and edit to suit your needs.
(you might be using metric library instead)
Firmso
2006-09-12, 05:20 AM
C:\Documents and Settings\All Users\Autodesk\Revit Building 9\Imperial Library\Annotations\Revision Tag.rfa
Then Saveas and edit to suit your needs.
(you might be using metric library instead)
Thanks Scott.
You're my hero today.