You'll need to create a new Project Parameter for Drawing Sheets so that you can Filter or Sort by it.

david.metcalf
2006-10-24, 06:12 PM
OK but how to go about adding a parameter for sorting by Volume?

Thanks,
David

Justin Marchiel
2006-10-24, 06:24 PM
sorry but i am not sure what you mean by volume.

Justin

david.metcalf
2006-10-24, 06:43 PM
These are for sheets that have to be issued by volume A B C and bound separately. We want the browser organization to be configured so that the project browser can allow users to sort and show them in a manner that speeds efficiency in showing by all, discipline, that way and plot them that way.

The firm intends to standardize the view and sheet naming to take advantage of sorting capabilities of the Project Browser to get a handle on the large amount of views and sheets generated on a project.

Thanks,
David

Justin Marchiel
2006-10-24, 07:11 PM
just create as many project parameters as you need (in terms of depth of sorting) and keep applying them to your sorting.

See attached.

Justin

david.metcalf
2006-10-24, 08:12 PM
No issues with this process by Disipline, it's sorting by volume I am trying to figure out.

Since I have been told enough time that a picture is worth a thousand words....

Let's see if this help.
David

Justin Marchiel
2006-10-24, 08:18 PM
make a project parameter that is called Volume and sort, or filter by that parameter. similar to what i had shown above, but instead instead of going sheet discipline first, use volumne, then discipline, then number.

you would have to assign the volumn parameter to each sheet otherwise it wont work.

Justin

david.metcalf
2006-10-24, 08:41 PM
If the project has sheet divisions for up to 3 volumes I would create three titleblocks.rfa's of which a volume parameter will be 1, 2, and 3 or A, B, and C in each one and then create my sheets in the project?

What is the procedure to create a Volume Parameter? : )

Justin Marchiel
2006-10-24, 10:24 PM
i hope that i am not missing something, but what i did was create a project paramater called Volume, that is associated to Drawing sheets. then applied sorting to the sheets, going by volume, discipline, then number.

Have a look at the attached file and tell me if this is what you intended.

Justin

david.metcalf
2006-10-24, 10:48 PM
With the exception of the ???? at the top.... precisely.

I can see the setting placed in the Project Parameters, but how will the sheets then defined as Volume A, B and so forth?

Thanks,
David

Justin Marchiel
2006-10-24, 11:18 PM
yeah i just did at the volume data to those sheets. but once you go to the properties and set it, they will all fall into organization.

Justin

david.metcalf
2006-10-25, 07:21 PM
Alrighty Mr. Yoda, It might be in my face and I can't see it despite the example. But how will I get the individual sheets to sort by volume after setting it up under the project organozer and making a

Bet it is real simple.

Justin Marchiel
2006-10-25, 08:59 PM
right click on the sheet and go to properties. at the bottom select the appropriate volume, and it will magically move under the right volume.