boofredlay
2006-11-24, 04:16 PM
Here is what I have done so far:
I have created an area plan that has a schedule linked to it. See image for the first floor area plan.
What I would like to do now is create another couple area plan schemes with different schedules for each. Like an existing area plan scheme. Area plan scheme 1 and so on.
How would I go about doing this?
Thanks for any help.
I have created an area plan that has a schedule linked to it. See image for the first floor area plan.
What I would like to do now is create another couple area plan schemes with different schedules for each. Like an existing area plan scheme. Area plan scheme 1 and so on.
How would I go about doing this?
Thanks for any help.