In the (cad) past, we typically noted up everything with text so when we recycled details from one project to another we don't have to worry about coordinating keynotes or manage a database.
We're getting ready to move from that mentality to keynotes for everything. Anyone have experience with saving details (like a parapet detail, for example) in Revit using either note blocks or keynotes?
I'd like to embed the numbers in the details and have them link back into the numbering system when loaded into a new file so we don't have to renote each time. Is this possible?
Which works best and what pitfalls should I look out for?
Thanks in advance.
We're getting ready to move from that mentality to keynotes for everything. Anyone have experience with saving details (like a parapet detail, for example) in Revit using either note blocks or keynotes?
I'd like to embed the numbers in the details and have them link back into the numbering system when loaded into a new file so we don't have to renote each time. Is this possible?
Which works best and what pitfalls should I look out for?
Thanks in advance.