Hello All, here's my issue: my PM's have just decided, halfway through contact documents, that we are going to use relative instead of actual elevations for our floor levels. As far as I know, the only way to make, say, Level 1 display at 0'-0" instead of 133'-0" is to actually move it to 0'-0". But this is a big, multistory building with many views of many kinds already created, and moving the entire thing down seems to send it into complete turmoil. Any suggests, or even good ideas to just fake it? I've tried the following:
*Locking all level lines together in an elevation view and hoping everything moved relative to it.
*Selecting all and moving it.
*Moving each level line independently.
All these methods eventually led to the same thing: unjoining elements, deleting views, unconnected walls, etc.
Again, any thoughts??? Thanks-
Ryan
*Locking all level lines together in an elevation view and hoping everything moved relative to it.
*Selecting all and moving it.
*Moving each level line independently.
All these methods eventually led to the same thing: unjoining elements, deleting views, unconnected walls, etc.
Again, any thoughts??? Thanks-
Ryan