jbbarrus
2007-07-26, 09:48 PM
I rarely draw pressurized pipes (water or irrigation) in profile. I do occasionally have municipalities require pressurized pipes to be drawn in profile. I now have an irrigation district asking me to draw all irrigation pipes and tees, bends, etc in profile. How do I define a bend or tee as a part? Any ideas?
Thanks, this site has been very useful.
JB
Thanks, this site has been very useful.
JB