WolffG
2004-08-18, 04:49 PM
I'm a consultant om a set of roof jobs for another firm. it involves roof work only.
The project consists of 5 school buildings.
I'm at a loss about how to set up the project, especially since eventually I will have to export it as a .dwg or .dxf.
My first thought is to set up the roofs with the building perimeter as a wall of an arbitrary height so that I can then use the roof function to draw the roofs and be able to key in details .......or should I just aet it up as a bunch of linework and treat it as a drafting job?
The buildngs are on five different sites, but will use the same set of details. What's the best way to set up the drawings........one plan view with all five buildings on them or five separate plan views, or five separate projects??
Thanks
The project consists of 5 school buildings.
I'm at a loss about how to set up the project, especially since eventually I will have to export it as a .dwg or .dxf.
My first thought is to set up the roofs with the building perimeter as a wall of an arbitrary height so that I can then use the roof function to draw the roofs and be able to key in details .......or should I just aet it up as a bunch of linework and treat it as a drafting job?
The buildngs are on five different sites, but will use the same set of details. What's the best way to set up the drawings........one plan view with all five buildings on them or five separate plan views, or five separate projects??
Thanks