View Full Version : Total Length in Material Takeoff
roy.70844
2007-11-19, 02:09 PM
Why can I not calculate the total length in a material takeoff? It can't be that hard can it??
Yours in exasperation,
Roy
aggockel50321
2007-11-19, 04:00 PM
Not sure what the reason is. You can in a wall schedule, for instance.
There is a workaround, though. Create a calculated value field, with it's formula being the parameter (i.e. length) you need to total. The calculated value field can be totaled, and you can make the original length field a hidden field if you don't want to see both.
roy.70844
2007-11-21, 04:35 PM
I was hoping to use this to counteract Revit's inability to schedule wall lengths (exterior face) correctly. If I could takeoff the length of masonry brickwork....
Roy
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.