I'm trying to create a cost schedule, the attached picture shows the work in progress. I've associated CSI Keynote numbers and entered the cost, and now I have two questions:
1. My concrete slab, foundation wall and precast panel wall - even though I've also given them keynote numbers - don't show up. Why?
2. Doors and windows have a 'per piece' price, whereas a concrete slab would have a 'per square foot' price. I created a Calculated Value in the schedule and wanted the formula to be "Cost*Area". It doesn't recognize Area as a field...so now what do I do? [Same applies for Volume when I need to calculate cost of e.g. foundation walls].
I've read through a lot of threads about scheduling and learnt a lot in the process, yet I'm still not able to figure this out on my own. Any help would be great,
thanks,
Axel
I'm trying to create a cost schedule, the attached picture shows the work in progress. I've associated CSI Keynote numbers and entered the cost, and now I have two questions:
1. My concrete slab, foundation wall and precast panel wall - even though I've also given them keynote numbers - don't show up. Why?
2. Doors and windows have a 'per piece' price, whereas a concrete slab would have a 'per square foot' price. I created a Calculated Value in the schedule and wanted the formula to be "Cost*Area". It doesn't recognize Area as a field...so now what do I do? [Same applies for Volume when I need to calculate cost of e.g. foundation walls].
I've read through a lot of threads about scheduling and learnt a lot in the process, yet I'm still not able to figure this out on my own. Any help would be great,