Clyne Curtis
2004-08-30, 08:26 PM
Hey All
I have added dummy sheets into a project for the contractors drawings so that they appear on my drawing index. In the past we have listed our electrical drawings (E-#) after the mechanical(M-#) and plumbing(P-#). Is there a way for me to move the electrical to the end of the index without renaming them?
Thanks
Clyne
I have added dummy sheets into a project for the contractors drawings so that they appear on my drawing index. In the past we have listed our electrical drawings (E-#) after the mechanical(M-#) and plumbing(P-#). Is there a way for me to move the electrical to the end of the index without renaming them?
Thanks
Clyne