Here's the problem I'm trying to resolve:
When I set the Ceiling Mark tag value, in the ceiling's element properties, I want the Ceiling
Schedule to:
1. Populate the field for the Ceiling Mark.................................................. (not a problem)
2. Identify the corresponding value in the Ceiling Key Schedule......... (is this even possible?)
3. Acquire the field values from the Ceiling Key Schedule to populate the remaining fields in
the Ceiling Schedule.
There doesn't seem to be a three way connection between the tag, ceiling shedule and the key schedule. The tag doesn't see the key schedule and the key schedule doesn't see the tag. They appear to work on the ceiling schedule independently. Consequently I can't drive the key schedule with the tag parameter. Or Can I?
When I set the Ceiling Mark tag value, in the ceiling's element properties, I want the Ceiling
Schedule to:
1. Populate the field for the Ceiling Mark.................................................. (not a problem)
2. Identify the corresponding value in the Ceiling Key Schedule......... (is this even possible?)
3. Acquire the field values from the Ceiling Key Schedule to populate the remaining fields in
the Ceiling Schedule.
There doesn't seem to be a three way connection between the tag, ceiling shedule and the key schedule. The tag doesn't see the key schedule and the key schedule doesn't see the tag. They appear to work on the ceiling schedule independently. Consequently I can't drive the key schedule with the tag parameter. Or Can I?