View Full Version : Door Schedule Question



SCShell
2004-09-07, 02:05 PM
Hi there,

Fairly new at scheduling; however, this is probably pretty basic. Is there a way to have certain (existing - non tagged) doors not be shown on the door schedule?

I have a building level tower floor plate in which I am doing a small T.I. and I don't need all of the other existing adjacent suite entrances nor stairwell, restroom and equipment room doors scheduled. (Currently, I just left them there and labeled them "existing")

Thanks in advance
Steve Shell

JamesVan
2004-09-07, 02:24 PM
Use the phasing functionality. For schedules, you'll probably have to create a new Phase Filter called "New Only" in which Existing elements are set to 'Not Displayed'