Good afternoon,
I am designing a beautiful chapel and have gotten to the beginning of CD's.
But now I find the architect has changed the datum for the model. I started with an elevation of 100' for my finish first floor , but now they tell me it is really 1043'-6".
I have a survey I linked in today and am trying to make my first toposurface. Those elevations clued me into the problem.
What the heck do I do now? If I try to change the elevation of the model one floor at a time everything is going to get all goofed up for sure. Is it possible? Should I have started the project differently?
Any thoughts on this would be greatly appreciated.
Have a great weekend.
Tom Weir
Los Angeles
I am designing a beautiful chapel and have gotten to the beginning of CD's.
But now I find the architect has changed the datum for the model. I started with an elevation of 100' for my finish first floor , but now they tell me it is really 1043'-6".
I have a survey I linked in today and am trying to make my first toposurface. Those elevations clued me into the problem.
What the heck do I do now? If I try to change the elevation of the model one floor at a time everything is going to get all goofed up for sure. Is it possible? Should I have started the project differently?
Any thoughts on this would be greatly appreciated.
Have a great weekend.
Tom Weir
Los Angeles