benmay
2008-08-05, 01:14 PM
I am currently setting up a series of core elevations on a 10 storey building, on a A1 sheet I need to split up the elevation and I will place side by side on my sheets.
To do this I have setup dependant views for all my walls which are designated part 1 or 2, that way at the overlapping section of wall I can co-ordinate my detailing
I did this for 20 elevations before I realised that I now have two elevation call-outs in my plan. One for the parent elevation and one for the dependant, not to mention when I have my elevations overlapping at say level 03, where I have 3 callouts!
Is there anyway to not have the callouts showing for the dependant views? or do I have to manually turn these things off? Or a better way to acheive what I am doing here?
Many thanks,
To do this I have setup dependant views for all my walls which are designated part 1 or 2, that way at the overlapping section of wall I can co-ordinate my detailing
I did this for 20 elevations before I realised that I now have two elevation call-outs in my plan. One for the parent elevation and one for the dependant, not to mention when I have my elevations overlapping at say level 03, where I have 3 callouts!
Is there anyway to not have the callouts showing for the dependant views? or do I have to manually turn these things off? Or a better way to acheive what I am doing here?
Many thanks,