sami
2008-12-02, 04:12 PM
What’s the proper way of getting a canopy slab on floor 2 to show on floor 1 dashed? The two methods I’ve tried:
1- Changing View Range (changing the Top offset number) but that doesn’t seem to change anything, am I missing something here?
2- Drawing some lines and locked them to the canopy slab outline, they update automatically but I’m not sure this is the best process on the long run.
What’s the recommended way?
1- Changing View Range (changing the Top offset number) but that doesn’t seem to change anything, am I missing something here?
2- Drawing some lines and locked them to the canopy slab outline, they update automatically but I’m not sure this is the best process on the long run.
What’s the recommended way?