CADone
2008-12-04, 10:33 PM
Hi All,
I have this drawing for a weldment. I have grouped all similar shape & size parts.
My question :
You will notice on the BOM that Item #1 has Qty = 4.
For some design requirement I need to drill holes one of these 4 tubes.
I need this tube with a hole to be a new item (#8) and the Item #1 should now show the Qty = 3
How can I achieve this?
Please guide me.
Thanks
C1
I have this drawing for a weldment. I have grouped all similar shape & size parts.
My question :
You will notice on the BOM that Item #1 has Qty = 4.
For some design requirement I need to drill holes one of these 4 tubes.
I need this tube with a hole to be a new item (#8) and the Item #1 should now show the Qty = 3
How can I achieve this?
Please guide me.
Thanks
C1