brenehan
2008-12-09, 11:00 AM
I have a project that is only a month old. In the past week it was upgraded to Revit 2009, current build SP3. The site file is linked into the building project file using shared coordinates. We are using Australian Map Grid, of the shared coordinate figures and thus they are quite large, but the elements in the file are right beside the project origin point.
The problem is, when I go to export the site setout drawing to a dwg format. I want to export it to the unit “meters” and to the shared coordinates origin. For some reason it always defaults to the project origin. I’m not able to reproduce the problem in other projects and I have never has this problem in the past using the same setup.
Any ideas why I may be having the problem?
Thanks
Brian
The problem is, when I go to export the site setout drawing to a dwg format. I want to export it to the unit “meters” and to the shared coordinates origin. For some reason it always defaults to the project origin. I’m not able to reproduce the problem in other projects and I have never has this problem in the past using the same setup.
Any ideas why I may be having the problem?
Thanks
Brian