does anyone have any advice on how to show relocated objects in a schedule?
i have 2 existing buildings with a lot of equipment in them and we need to have a schedule that shows where the equipment was originally located, whether or not it's being reused or not, and which building it ends up in if it's being relocated. is there any way that i can use Phases to automatically show this or am i going to have to do a lot of typing in the schedule?
i have 2 existing buildings with a lot of equipment in them and we need to have a schedule that shows where the equipment was originally located, whether or not it's being reused or not, and which building it ends up in if it's being relocated. is there any way that i can use Phases to automatically show this or am i going to have to do a lot of typing in the schedule?