phillamad
2008-12-18, 02:06 PM
This issue might already have been answered but I can't seem to find it.
I am trying to generate a mullion schedule from the curtain walls that I have created. Although I can get them to show properly in elevation, the schedule is not realistic. The construction of the frames would warant for either the vertical or the horizontal mullions to be continuous.
My problem is that the mullions are broken at each grid location which generates only mullion segments in the table. For example: If I have a 2400mm wide frame that is 3600mm high, with 1 vertical intermediate mullion and 3 horizontal intermediate mullions, the horizontals are called up in the schedule as being their segment lenghts. The problem is that the verticals are also being generated in segments even though I have selected my mullion joins option.
Is there a way to tell it not to break the overall length of either the vertical or the horizontal?
I am trying to generate a mullion schedule from the curtain walls that I have created. Although I can get them to show properly in elevation, the schedule is not realistic. The construction of the frames would warant for either the vertical or the horizontal mullions to be continuous.
My problem is that the mullions are broken at each grid location which generates only mullion segments in the table. For example: If I have a 2400mm wide frame that is 3600mm high, with 1 vertical intermediate mullion and 3 horizontal intermediate mullions, the horizontals are called up in the schedule as being their segment lenghts. The problem is that the verticals are also being generated in segments even though I have selected my mullion joins option.
Is there a way to tell it not to break the overall length of either the vertical or the horizontal?