patricks
2009-01-07, 08:55 PM
I'm wondering about the cut/fill numbers my toposurface graded region is reporting.
I'm working on an addition to an existing building. The new and existing building finished floor is a couple feet above the grade around the building, so I have a pad set up to bring the grade underneath the building pad up to the underside of my building slab.
So in an existing view, I created a pad for the existing building, on the existing topo.
Then in a new view, I clicked on Graded Region and selected to copy internal points of the existing topo. When I did this, the pad under the existing building was also copied along with the toposurface. So now I have a pad created in New Construction underneath my existing building, with another toposurface extending up under that pad. I also have another pad under my new building, with a toposurface extending up under that pad, as well.
So, on my New Construction phase, I have a total of 3 toposurfaces. The overall site, and the surface underneath each pad.
When I check the Net Cut/Fill for the overall site, it's showing a net fill of 9570 CF. If I delete one of those pads (and its toposurface), the net cut/fill for the overall site toposurface INCREASES! Is this correct behavior? How do I know if the cut/fill number for the site toposurface is taking into account the fill required underneath my new slab, and NOT counting any fill under the existing building, since we're not touching that one?
I'm working on an addition to an existing building. The new and existing building finished floor is a couple feet above the grade around the building, so I have a pad set up to bring the grade underneath the building pad up to the underside of my building slab.
So in an existing view, I created a pad for the existing building, on the existing topo.
Then in a new view, I clicked on Graded Region and selected to copy internal points of the existing topo. When I did this, the pad under the existing building was also copied along with the toposurface. So now I have a pad created in New Construction underneath my existing building, with another toposurface extending up under that pad. I also have another pad under my new building, with a toposurface extending up under that pad, as well.
So, on my New Construction phase, I have a total of 3 toposurfaces. The overall site, and the surface underneath each pad.
When I check the Net Cut/Fill for the overall site, it's showing a net fill of 9570 CF. If I delete one of those pads (and its toposurface), the net cut/fill for the overall site toposurface INCREASES! Is this correct behavior? How do I know if the cut/fill number for the site toposurface is taking into account the fill required underneath my new slab, and NOT counting any fill under the existing building, since we're not touching that one?