I have a mass floor schedule with a Mass: Comments field included.
As I change the mass comments in the mass schedule, the mass floor schedule doesn't get updated as Revit should.
Is this an issue or is it just me?

christo4robin
2009-01-17, 04:42 AM
I have experienced the same issue, although I did not report it to support. As a workaround, go into the dialog where you check which levels you would like the floor are to be calculated at. Check a different level, ok your way out. Then go back in and check the level you actually want, and uncheck the one you don't, and ok your way out again. Then it updates. PITA, but it works.