we are working on a project as a consultand with an architectural firm.
the situation is this, we have control over the central file and will issue the file to them at the end of every week for assesment. The architect has now produced some detail in the central file and would like these to be used in the project. The issue is we have already done 3 days work and our central file is now ahead of the last one issued.
Is there any way to insert the views created by the architect (essentially using the same model, only older) into our current central file or does the "insert views" only work for 2d elements and drafting views?
we are working on a project as a consultand with an architectural firm.
the situation is this, we have control over the central file and will issue the file to them at the end of every week for assesment. The architect has now produced some detail in the central file and would like these to be used in the project. The issue is we have already done 3 days work and our central file is now ahead of the last one issued.
Is there any way to insert the views created by the architect (essentially using the same model, only older) into our current central file or does the "insert views" only work for 2d elements and drafting views?