Does anyone have any tricks to export schedules out of Revit and into ACAD? Are we stuck with the same lame export tools?
Thanks Bill
arqt49
2009-03-16, 11:16 AM
What I usually do is extort to ODBC, then do some queries in Access, and link that data into a Excel spreadsheet.
Finally, inside Autocad, you can insert and data link the tables from Excel.
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.