tcupp
2009-03-27, 03:23 PM
I made a mistake and sent a project out without realizing that when I do revisions and have them automatically populate on a sheet that they will always need to be in the same location because they are in the framesheet.
So, is it possible to place a revision schedule on a sheet rather than in the framesheet, giving me the capability to move it around.
If not, the only workaround that I can think of would be to create multiple framesheets with the revision schedule in different locations.
Any other ideas?
So, is it possible to place a revision schedule on a sheet rather than in the framesheet, giving me the capability to move it around.
If not, the only workaround that I can think of would be to create multiple framesheets with the revision schedule in different locations.
Any other ideas?