Results 1 to 5 of 5

Thread: Move site or move project?

  1. #1
    I could stop if I wanted to
    Join Date
    2003-10
    Location
    Santa Barbara
    Posts
    397
    Login to Give a bone
    0

    Default Move site or move project?

    Ive created a project at an arbitrary elevation because I didnt have a survey, then when I loaded in the survey (at elev 0'-0") and created a toposurface, which gets placed at the proper elevation, I have to move the project up to the proper elevation relative to the site.
    however im having trouble moving it, is there an alternative of moving the site down and re-establishing the 0'-0" level so the contours will match the survey after its moved?

  2. #2
    All AUGI, all the time
    Join Date
    2007-06
    Location
    Melbourne, Australia
    Posts
    602
    Login to Give a bone
    0

    Default Re: Move site or move project?

    Hi jwilhelm,

    I create a separate rvt for the toposurface.

    In this separate file, the toposurface is created at the correct elevation - as per the land surveyors data.

    When linking the toposurface file to the model file, you can then position it correctly in relation to the finished floor level of the building.

    If you create a shared elevation, you can then use the spot elevation tool to show the RL's as per the survey info whilst at the same time the project levels of the floor level / ceiling etc remain as project levels.

    Cheers,



    Ian

  3. #3
    I could stop if I wanted to
    Join Date
    2003-10
    Location
    Santa Barbara
    Posts
    397
    Login to Give a bone
    0

    Default Re: Move site or move project?

    What is a "shared elevation"?

  4. #4
    All AUGI, all the time
    Join Date
    2007-06
    Location
    Melbourne, Australia
    Posts
    602
    Login to Give a bone
    0

    Default Re: Move site or move project?

    Quote Originally Posted by jwilhelm View Post
    What is a "shared elevation"?
    Start the spot elevation tool.

    Hit the properties button.

    The elevation OOTB is set to vertical / project.

    Hit Edit & then duplicate & rename as Shared. Scroll down the properties, about 2/3rds way down is the elevation origin. Change this to be shared.

    I also change the units of the shared elevation to match the units of the survey. In my case, the project units are millimetres and the surveys are shown as metres, this way on the sheets it matches exactly the surveyors info.

    Cheers,

    Ian

  5. #5
    All AUGI, all the time Gadget Man's Avatar
    Join Date
    2004-10
    Location
    Sunshine Coast, QLD, Australia
    Posts
    607
    Login to Give a bone
    0

    Default Re: Move site or move project?

    There is a brilliant video tutorial series about this very issue HERE.

    True, you have to subscribe to see this particular one (there are several other good tutorials free there too, among the wealth of subscription-only ones) but I absolutely encourage anybody to do it! And now, apparently, they have a special there...

Similar Threads

  1. 2015: Can I move Inventor assemblies and their components to a different project?
    By gretbrough in forum Inventor - General
    Replies: 8
    Last Post: 2014-09-22, 10:05 PM
  2. Add a “move up/move down” and "add multiple" options to parameters
    By Wish List System in forum Revit MEP - Wish List
    Replies: 2
    Last Post: 2014-08-07, 03:42 AM
  3. 2012: How to SNAP to point on SPHERE for move/3D MOVE?
    By rick663901 in forum AutoCAD 3D (2007 and above)
    Replies: 3
    Last Post: 2012-09-19, 07:59 AM
  4. Replies: 3
    Last Post: 2008-12-29, 10:58 AM
  5. Dimension points do not move when using the Move command
    By sudhirkizhakoote in forum AutoCAD General
    Replies: 6
    Last Post: 2005-10-16, 05:33 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •