this is my first time to link the primavera P6 to naviswork.
we are trying to link a Primavera P6 file to Navisworks 2010,
but are not having any success.
we can select the primavera file from a list of projects (see image 01 attached) from within navisworks -
the program does some think-time and reports that status is not available
see image 02
need to help to solve the problem. thanks