I have a site plan with 9 linked buildings ( 4 types and 5 copies).

The drawings are to be converted into another CAD sytem , using dwg as the medium.

When the master plan file is exported as dwg, the buildings forget where they live. If I go through the process of sharing project co-ordinates ( publishing and saving locations back to each separate building file, ... etc ) is that going to help them remember ? Or does this only work in a Revit environment ?