does the project base point work the same way in MEP as it does in Arch or Struct? I'm getting different results that I expected. Any ideas? Thanks.
|
does the project base point work the same way in MEP as it does in Arch or Struct? I'm getting different results that I expected. Any ideas? Thanks.
Changes from the client required the architect to mirror the building. I turned on the project base point, unclipped it, moved it to the agreed location, re-clipped it, then set N/S, E/W to 0,0. Updated the architectural and the models didn't align. That same system worked with the structural model. Any thoughts, thanks.
I forgot a step. I had to remove and re-attach the linked model. Is there a better way to do this? Thanks.