    Red face Material Takeoff Schedule Sorted by Room

    We are working on a pretty large project with many types of rooms
    I want Revit to read the finishes in that room (ceiling type, north wall, east wall, floor material etc.) I Might even want the area of 1 particular material sorted by room. Is this possible????

  2. #2
    Certifiable AUGI Addict
    Join Date
    2004-05
    Location
    St. Louis, Missouri
    Posts
    3,135
    Login to Give a bone
    0

    Wink Re: Material Takeoff Schedule Sorted by Room

    You might consider using a Schedule Key--you set up a Room Style for each typical room type and fill out the materials for each surface--then apply the Room Style to each room.

    hope that may help.

    cheers

  3. #3
    Member
    Join Date
    2009-02
    Location
    Jonesboro, AR
    Posts
    33
    Login to Give a bone
    0

    Default Re: Material Takeoff Schedule Sorted by Room

    I Figured that was the way I was going to have to go. Why cant they just include rooms as a parameter in the material take-off field options that woul simplify everything.

  4. #4
    AUGI Addict
    Join Date
    2000-11
    Location
    Pittsburgh, PA USA
    Posts
    1,906
    Login to Give a bone
    0

    Default Re: Material Takeoff Schedule Sorted by Room

    Quote Originally Posted by ksmith.207733 View Post
    I Figured that was the way I was going to have to go. Why cant they just include rooms as a parameter in the material take-off field options that would simplify everything.
    I agree that changes need to be made to how/what rooms can show in a schedule. I'm not sure it would be quite as simple as your statement. Look into some of the posts on the blog http://insidethefactory.typepad.com/ to see why some things end up being a heck of a lot harder than they sometimes appear. Plus what "materials" schedule from a room would most likely be "gyp Bd" excreta, depending upon how you name the materials.

    In addition, I have seen the retail world use room separation lines to create multiple rooms in on large open area. These rooms would be "pads" for various vendor's products. In this case, which room would a ceiling schedule in? Would you require that a ceiling can ONLY be defined within a single room?

    I'm not trying to talk down the need for change, not pick on you or your post particularly, but when the entire spectrum of Revit use is considered, a "simple" change can become a huge deal. Users scream bloody murder when an intended change to improve one item inadvertently changes the behavior of other parts of the program.
    Too many people run down the program because it does not do what they want, the way they want, when they want it.

  5. #5
    Member
    Join Date
    2009-02
    Location
    Jonesboro, AR
    Posts
    33
    Login to Give a bone
    0

    Default Re: Material Takeoff Schedule Sorted by Room

    I get what you're saying and understand the limitations. I don't expect Autodesk to cater to my firm's specific needs, and I rarely have anything to complain about when it comes to Revit I love the software, but I do think they should try to streamline the process of scheduling finishes, This should be a little easier with the split face and paint options that have been added in recent versions.

Similar Threads

  1. Material Takeoff by Level or by Room
    By jim.155208 in forum Revit Architecture - General
    Replies: 5
    Last Post: 2021-12-23, 06:29 AM
  2. Schedule/Quantities vs. Material Takeoff
    By Ning Zhou in forum Revit Architecture - General
    Replies: 3
    Last Post: 2010-01-19, 07:18 PM
  3. Material Takeoff & Room Schedules
    By Faulkner-S1 in forum Revit Architecture - General
    Replies: 0
    Last Post: 2009-12-14, 07:04 PM
  4. Wall sweep schedule / material takeoff not possible?
    By Nic M. in forum Revit Architecture - General
    Replies: 2
    Last Post: 2006-09-12, 12:59 PM
  5. Room schedule & Material takeoff
    By Alvin_Alejandro in forum Revit Architecture - General
    Replies: 1
    Last Post: 2006-04-22, 08:25 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •