Hey guys,
I'm trying to create a Power & Lighting Usage Report but when I create a custom schedule the fields of actual lighting load, actual power load, actual lighting load/area, and actual power load/area are all set to 0. I have my light fixtures and power recepticals place on my project.
If anyone has any advice on how to achieve power usage reports that would be fantastic.
Thanks.
* I figured it out, went electrical settings and turned on load calculations. Hmm my power loads are still not appearing any ideas?