Hi,
In Revit MEP 2011 one pipe cross the another pipes standard fittings are automatically placed on the intersection point. Even when I cross the pipes with different materials( e.g. Fire protection pipe with carbon steel material and Drainage pipe with PVC materiall)the standard cross fitting placed on intersection point. I don't want to place standard fitting for same.
Is there any setting in Revit MEP 2011 for solve this problem?
Regards
Swapnil Raut